Skip to content

Turning Visions Into Reality

Welcome

Our professional consulting firm has been serving the Midlands since 1960. We offer a full range of engineering, architectural, landscape architecture and surveying services. We work diligently with our clients to maintain a vibrant and growing community. We also work to encourage the local economy. Our professional team works closely with you to design the most cost-effective, long-term solutions for your project.

Untitled-1

Engineering

Streets/Highways
Traffic Engineering
Bridge/Culvert Design
Bridge Inspections
Hydraulics/Hydrology
Structural Analysis
Water/Wastewater
Land Development
Parks/Recreations
Const. Management

CB Savings Bank

Architecture

Fire Stations
Commercial Facilities
Additions/Renovations
Recreational Facilities
Municipal Facilities
Feasibility Studies
Sustainable Design
Const. Management

Master Planning

HGM Associates Inc

Landscape Architecture

Streetscape

Parks / Playgrounds

Ball Fields

Rain Gardens

Outdoor Patio Areas

Landmarks

College Campus Areas

Transportation Corridors

Trails / Recreation

Athletic Complexes

DSCF0633

Surveying

Topographic Surveys

ALTA/NSPS Surveys

Subdivision Platting

Boundary Surveys

Utility Surveys

3-D Laser Scanning

Horizontal & Vertical Control

Photogrammetric Control

Right-of-Way Design

Contact Us

Chairman of the Board
President
Council Bluffs
Vice President
Omaha
Vice President
Council Bluffs

Featured Project

West Broadway is a heavily developed two-mile thoroughfare in western Council Bluffs. It is the main entrance to Council Bluffs from the City of Omaha. Rather than just reconstruct the roadway in the similar condition, the City decided to undertake a major overhaul and facelift of the corridor. There were multiple public information meetings, individual meetings, business and landowner meetings. There was input through this public meeting process and through the City’s website with a dedicated website for this project. The project has been broken into five phases so that each phase can be constructed in any one given construction season. The first phase was constructed in 2017 and the last phase is anticipated to be constructed in 2021. A major challenge was to design and constructed the five-lane roadway segment with landscaping and various streetscape amenities and stay within the existing right of way. There was an extensive amount of planning for construction phasing. It was required that the street always maintain one lane in each direction and a middle turn lane.

IMG_20200708_112931_2
West Broadway
Scroll To Top